Open Factory

com.open-factory/open-factory

Lead times, prices, tariffs and grid interconnection terms for factory and datacenter equipment.

This endpoint completed initialize and tools/list. No tool was called.

Rank
#4139
Score
81
Tool tokens
1,935
Tools
12

Tools

Token cost is the o200k count of the tools list JSON, including schemas, before any tool is called.

  • search_articles

    Search Open Factory articles by topic, equipment class, company, tag or series ID. Returns the best matches with URL, date, pillar, summary and the CSV files behind their charts. Use get_article for t

  • get_article

    Full metadata and the free text (markdown) of one Open Factory article by slug, with its cited sources and CSV files. Articles with a paywall return the text up to the paywall and say so.

  • get_index_readings

    The current public headline number of every Open Factory model (lead time, build cost per MW, book-to-bill, OEM disclosure, energization year), each with its source document and date.

  • get_lead_times

    Current published lead time, in weeks, for factory and datacenter electrical equipment classes (transformers, switchgear, switchboards, MCC, busway, gensets, ATS, drives), each with the OEM or publish

  • get_price_bands

    Transaction price bands from public procurement awards: pad-mount and power transformers ($/kVA), MV switchgear, gensets ($/kW) and chillers ($/ton), with p25, median, p75, n, buyers and award-date ra

  • get_tariff_rates

    US import tariff for factory and datacenter equipment: 22 HTS lines (transformers, switchgear, gensets, chillers, machine tools, robots and parts) by origin country, with MFN, Section 232, Section 301

  • get_large_load_terms

    What a 50 MW or larger load pays to connect in fifteen US utilities and markets: study fee, security or collateral per MW, minimum bill, contract term, ramp, exit fee and realistic energization year,

  • get_book_to_bill

    Latest quarter orders, revenue, backlog, book-to-bill and backlog growth for the electrical, power and cooling OEMs (Eaton, GE Vernova, Siemens Energy, ABB, Schneider, Vertiv, Powell, Caterpillar, Cum

  • get_disclosure_scorecard

    Whether each equipment OEM publishes a dated lead-time schedule, list prices, backlog in dollars, capacity in units and delivery performance, scored yes, partial or no with the document behind every c

  • get_record

    Every dated, checkable forecast Open Factory has made (lead times, prices, tariffs, power), the public series it is scored against, the date it resolves, and the result once scored. Filter by status.

  • list_datasets

    The CSV files behind every chart Open Factory publishes, grouped by article, with direct download URLs. Each file keeps a source column naming the filing, tariff, docket, award or series the row came

  • get_tool_data

    The source table one Open Factory calculator runs on, with every input's provenance: copper-wire-price-sheet, genset-tco, interconnection-cost, lead-time-schedule, pjm-capacity-bill, quote-check, tari

Nearby in Other

#13
4grand

Free fantasy pools for the four tennis Grand Slams. What play for love means, and who is winning.

Alive
score
83
#14
53ON

Directory and marketplace of local businesses and independent professionals near you.

Alive
score
83
#18
adsbiq

Read-only access to live ADSBiq aircraft and network state, with community contribution metadata.

Alive
score
83